Ongoing Projects

Kingdom of Saudi Arabia, SWCC Shuqaiq Phase 2 Project;

  • Production of segment bends of the pipeline,
  • Station piping,
  • Fabrication and erection of welded and vertical storage tanks,
  • Equipment installation, like pumps, surge vessels, compressors, water cooling systems, fire protection systems etc.
  • Sewer system drainage, rain water system drainage, utility water system,